Consultation Report

Print

The Autumn 2008 Interim Report on Community and Stakeholder Involvement [9.5 MB] is now available for download in PDF1 format.

The report sets out the details of the consultation undertaken to date and summarises the feedback received from the Spring 2008 consultation exercise, including the community workshop. The report describes how Portsmouth Water has taken on board the feedback and includes a revised outline plan illustrating the range of features that are proposed to be taken forward.

An Executive Summary [8 MB] of the report is also available.

The Spring 2008 Public Consultation Document is available for download [5.64 MB] in PDF1 format.

PLEASE NOTE Correction on page 8 of report: Figure 2.1 - words on left hand side of graph should read "Litres/person/day".

1If you do not have suitable software for viewing the PDF, please download the free Adobe Viewer.










Legal Notice | Site Map

Copyright © Portsmouth Water Ltd
P.O. Box 8,West Street, Havant, Hampshire, PO9 1LG
Registered in England No 2536455 VAT No GB 615375835